Noumi · AsterVale Advisory
Win/Loss & Competitive Analysis  ·  AV-2026-041  ·  30 September 2026

Customer opportunity report

AsterVale Win/Loss & Competitive Analysis

Historical CRM evidence, competitive fit and decision implications for opportunity AV-2026-041. The report tests whether approved engagement context can carry from proposal work into client-preparation tasks without losing source control, reviewer trust or commercial readiness.

Directional signal: the closest past wins reward editable, connected work products and context continuity. The losses show where that story can be outweighed: controlled publication, access administration, a required connector, and unresolved assurance. AsterVale must prove its workflow advantage while closing those gates.

40CRM opportunities in the extractAll compared Crestline
6 / 9Direct-comparable outcomes were wins66.7% of decided deals
54.5%Overall win share among decided deals18 wins / 33 decisions
60AsterVale initial user cohortTwo workflow families

Wins cluster around connected work.
Losses cluster around hard gates.

The selected deals are qualitative decision records. Bars show recorded disposition, not product performance or the probability of an AsterVale award.

Disposition, by selected sample

Percent of each group; labels include the underlying count. “No decision” is neither a win nor a loss.

Outcome mix by CRM sampleAll 40 records: 18 won, 15 lost, 7 no decision. The nine direct comparables: six won, three lost. The 18 adjacent-risk records: nine won, two lost and seven no decision. All CRMn = 4018 won · 45%15 lost · 37.5%7 · 17.5% Directn = 96 won · 66.7%3 lost · 33.3% Adjacentn = 189 won · 50%2 · 11.1%7 no decision · 38.9%
Closed WonClosed LostNo Decision
Read carefully: direct-comparable win share is 6/9 = 66.7% among decided deals. Overall is 18/33 = 54.5%. The adjacent group’s 9/11 = 81.8% decided win share is not stronger evidence: it is broader and includes seven non-competitive purchase deferrals.

Seat count in the direct cohort

Each mark is one opportunity; row position denotes outcome. The sample spans 46–72 seats, with a median of 60.

Seat counts for direct-comparable opportunitiesSix wins at 46, 52, 55, 57, 66 and 68 seats. Three losses at 60, 61 and 72 seats. The selected cohort’s median size is 60 seats. AsterVale · 60 seats Won · 6Lost · 3 465255576668 606172 4050607080 seats
WonLost60-seat reference
Not a size effect: the sample is deliberately near 60 seats, but 3 of 9 lost. Size alone does not separate outcomes; buying criteria and decision readiness do.
What the CRM suggests: direct wins cite editable deliverables, context/project continuity, multi-file revision, lower review friction, and a right-sized first phase. Direct losses cite a governance queue, Notion write-back and late assurance closure. Reasons are CRM-recorded qualitative attributions; treat them as hypotheses to test, not causal proof.

Two samples, with different jobs.

The direct group gives the closest like-for-like workflow and account context. The adjacent group broadens the risk lens; it is not a conversion benchmark.

How the cohorts were selected

Reproducible inclusion rules applied to the full 40-row CRM export; each record lists Crestline as competitor.

Direct-comparablen = 9
Consulting/advisory; 40–80 licensed users; proposal, briefing, presentation or presales response work—or a clearly linked multi-file client workflow. 60 seats falls near the sample median (60).
Adjacent-riskn = 18
Exclude direct deals; retain 30–90 seats and a nearby bid/tender/RFP/report/deliverable/pitch/meeting workflow, or a No Decision record with a stated purchase-readiness risk. All seven No Decisions are included and remain separate.
DenominatorWin share = Closed Won ÷ (Closed Won + Closed Lost). No Decisions excluded from win-share denominator and shown separately in every outcome count.
Observed resultFull history: 18 won / 15 lost / 7 no decision. Direct: 6 / 3 / 0. Adjacent: 9 / 2 / 7. Records span Feb 2025–Sep 2026; product versions vary.

Interpretation guardrails

The paired rails below separate historical evidence from account-specific competitive fit.

Observed CRM
Solid rail · descriptive outcomes

Moderate, selected evidence: 9 direct deals; all Crestline competitions; buyer-confirmed reasons are common, not universal.

AsterVale deal fit
Dotted rail · source-based comparison

Promising on cross-task context and editable outputs; contingent on access/security, provisioning, contract and cost approval. Not an award score.

Why not extrapolate 66.7%? Small purposeful sample, qualitative outcome coding, selected CRM survivors, different product generations and customer-specific Must/Scored gates. It cannot estimate an individual deal probability.

Noumi is stronger on continuity.
Crestline has credible veto points.

The supplied comparison and Crestline Workbench 6.2 handbook indicate a trade-off. The decision turns on whether AsterVale accepts Noumi’s documented operating boundaries.

Decision axisAsterVale’s stated testNoumi evidence / boundaryCrestline evidence / boundaryDeal implication
Carry context forwardReuse approved engagement material in a later task without another upload; preserve scope and source version.Project files and scoped memory are documented across tasks. Search is not exhaustive; stale sources can still surface.Saved investigations retain selected references; broader continuity needs explicit selection, configured workflow or manual assembly.Noumi edge when continuity is the buyer’s central pain. Demo the same source across proposal and meeting prep.
Editable work productsOpen and edit DOCX, XLSX and PPTX; keep reviewer rework visible.Native editable Office deliverables documented; exact layout, embedded objects and advanced animation are not guaranteed.DOCX/PDF/Markdown/CSV exports described; handbook does not describe native editable PPTX or formula-bearing XLSX generation.Noumi edge on a Must requirement, but show native editing and measure reconstruction rather than only draft speed.
Governance & source lifecycleControlled, authorized files; approved/current evidence; client separation.Projects and shared knowledge support working boundaries; a project is not a records-management classification.Collection owners, approved publication, version signals, review/retirement, retention and legal-hold controls are documented.Crestline edge if centrally governed reference content dominates. Confirm whether AsterVale is buying project work or a governed knowledge layer.
Identity & provisioningTest membership, leavers, group mapping, offboarding; determine acceptable admin effort.SAML configurable; SCIM and group synchronization not included; lifecycle administration is manual.SAML 2.0 and SCIM 2.0 user/group provisioning documented; nested-group behavior remains unproven.Crestline edge on automated provisioning. Get AsterVale IT to explicitly accept or reject Noumi’s manual operating model.
Security & termsApprove actual processing route, subprocessors, incident notice, availability and contract deviations.Singapore processing detail is more specific in the supplied comparison; contract and assurance gaps remain to close.Singapore or EU hosting options; handbook defers actual processing details and is not an audit opinion or executed service schedule.No feature fit substitutes for written security and legal approvals. Resolve incident notice and required evidence by named owner.
First-year listed fees60 seats; support, implementation, usage, tax and internal cost understood.$79,200 first-year; $69,600 recurring, from supplied comparison’s dated quote.$75,600 first-year; $63,600 recurring, from handbook’s stated price.Crestline lists $3,600 less year one / $6,000 less recurring. Not normalized TCO: onboarding, support, sources, usage units, custom work and internal effort differ.
Decision boundary for this opportunity. AV-004 and AV-017–019 are Must requirements covering editable deliverables, engagement-scoped context and visible memory controls. AV-043 is a Scored requirement that permits an alternative: Noumi provides SAML with manual lifecycle administration, while Crestline documents SCIM. AsterVale IT must record whether the alternative is acceptable. The RFP weights are priorities, not vendor scores; no percentage score has been calculated. The commercial comparison uses a Noumi quote issued 14 October 2026 after the workbook’s 30 September verification date, so the quote and scope must be reconciled before a decision.

What the records actually say.

Full direct-comparable cohort and full adjacent-risk cohort. Quotes are transcribed from the CRM `buyer_quote` field; confirmation labels are retained to show evidence quality. Account names and record IDs are preserved for internal follow-up.

How to use this register: read the direct-comparable cohort first, then the adjacent-risk cohort. The records explain what to test with AsterVale; they do not forecast the outcome and do not override the current Requirements Matrix.
27 records

Direct-comparable · 9 records

40–80 seats; consulting/advisory and tightly matched client workflows.

Deal / accountSeats · outcomeRecorded reason · buyer quoteConfirmation
OP-2025-0101
MorrowPeak Consulting
Management consulting · proposal preparation · closed 06 Feb 2025
55
Closed Won
Editable deliverables
“We need the proposal and cost workbook to agree after every revision.”
Confirmed by buyer
Buyer debrief · 04 Feb 2025
OP-2025-0102
CedarQuay Advisory
Financial advisory · client briefings · closed 27 Feb 2025
72
Closed Lost
Knowledge governance
“Our policy owners need an approval queue before wider access.”
Confirmed by buyer
Procurement decision letter · 25 Feb 2025
OP-2025-0103
VelaBridge Partners
Strategy consulting · proposal & presentation · closed 11 Mar 2025
46
Closed Won
Project continuity
“The second review kept our agreed exclusions without another briefing.”
Confirmed by buyer
Pilot review minutes · 11 Mar 2025
OP-2026-0107
LindenArc Consulting
Operations consulting · proposal preparation · closed 24 Sep 2026
60
Closed Lost
Notion write-back
“Our methodology owners publish in Notion and will not maintain a second copy.”
Confirmed by buyer
Architecture review · 23 Sep 2026
Crestline 6.2 evaluated
OP-2025-0108
Rainford Partners
Transaction advisory · engagement briefing · closed 14 May 2025
52
Closed Won
Context retention
“The project kept the final assumptions when a new analyst joined.”
Confirmed by buyer
Partner interview · 12 May 2025
OP-2025-0113
Northwick Design Partners
Engineering consulting · technical proposal packages · closed 07 Aug 2025
68
Closed Won
Multi-file editing
“Reviewers changed the scope and saw it carried into the other deliverables.”
Confirmed by buyer
Technical acceptance · 05 Aug 2025
OP-2025-0116
JuniperSpan Consulting
Technology consulting · presales response · closed 19 Sep 2025
61
Closed Lost
Security review
“We could not close our assurance questionnaire before the procurement deadline.”
Buyer statement relayed by seller
Call summary · 17 Sep 2025
OP-2025-0119
Oakwell Transformation
Management consulting · proposal preparation · closed 04 Nov 2025
57
Closed Won
Review effort
“Reviewers spent their time on the argument rather than moving text between files.”
Confirmed by buyer
Pilot retrospective · 30 Oct 2025
OP-2025-0121
Tamarind Gate Consulting
Sustainability advisory · proposal & meeting prep · closed 03 Dec 2025
66
Closed Won
Scope fit
“The two workflows fit our first phase without adding a separate authoring service.”
Confirmed by buyer
Commercial approval note · 01 Dec 2025

Adjacent-risk · 18 records

Wider workflows or explicit purchase-readiness risk; industries and comparability vary.

Deal / accountSeats · outcomeRecorded reason · buyer quote / CRM noteConfirmation
OP-2025-0105
Oriole Ridge Associates
Business consulting · bid response · closed 09 Apr 2025
38
No Decision
Budget freeze
“The workflow worked, but our partner group has postponed all new platforms.”
Confirmed by sponsor · email · 08 Apr 2025
OP-2025-0106
Westmere Analytics
Research advisory · client reporting · closed 24 Apr 2025
88
Closed Won
User-managed memory
“I can correct the report convention once and inspect what was retained.”
Confirmed by buyer · acceptance notes · 22 Apr 2025
OP-2025-0110
Arcfield Advisory
Risk consulting · client deliverable assembly · closed 18 Jun 2025
42
Closed Won
Template fidelity
“The editable output removed our last round of rebuilding tables.”
Confirmed by buyer · pilot sign-off · 16 Jun 2025
OP-2025-0112
FablePoint Advisory
ESG consulting · proposal drafting · closed 17 Jul 2025
34
No Decision
Sponsor departure
“Internal notes: the incoming practice head is expected to reassess the business case next quarter.”
Corroborated by two internal notes · 15 Jul 2025
OP-2025-0115
Hearthway Advisory
Change management · client meeting prep · closed 05 Sep 2025
76
Closed Won
Reusable methods
“New staff can follow the agreed preparation method without copying old chats.”
Confirmed by buyer · sponsor call · 03 Sep 2025
OP-2025-0117
Kestrel Grove Advisory
Economic advisory · research to report · closed 07 Oct 2025
44
Closed Won
Editable output
“Our economists want the source references next to the editable narrative.”
Confirmed by buyer · evaluation workbook · 02 Oct 2025
OP-2025-0118
MarbleLeaf Partners
Accounting advisory · client briefing · closed 23 Oct 2025
82
No Decision
Internal alternative
“The firm will first test a tool already covered by its enterprise agreement.”
Confirmed by buyer · committee note · 21 Oct 2025
OP-2025-0122
Willowcrest Advisory
Transformation consulting · client reports · closed 18 Dec 2025
54
No Decision
Data readiness
“We need to decide which versions are authoritative before reopening the trial.”
Confirmed by buyer · workshop minutes · 17 Dec 2025
OP-2026-0125
Cloudmarsh Logistics
Logistics · account briefing · closed 05 Feb 2026
47
Closed Won
Project continuity
“The account team returned to the same decisions each week.”
Confirmed by buyer · account retrospective · 03 Feb 2026
OP-2026-0127
Elmstone Retail
Retail · campaign reporting · closed 04 Mar 2026
36
No Decision
Priority change
“The merchandising system replacement took the available project team.”
Buyer statement relayed by seller · phone note · 02 Mar 2026
OP-2026-0128
Fjordwell Components
Industrial supply · tender package · closed 23 Mar 2026
64
Closed Won
Multi-format production
“A document and editable pricing worksheet were both required at handover.”
Confirmed by buyer · pilot acceptance · 19 Mar 2026
OP-2026-0131
Ironbloom Systems
Industrial software · presales proposals · closed 06 May 2026
79
Closed Lost
Incumbent consolidation
“The CIO chose one knowledge platform already used by support.”
Confirmed by buyer · executive debrief · 04 May 2026
OP-2026-0133
LumenDock Travel
Travel services · supplier research · closed 03 Jun 2026
31
No Decision
Insufficient usage
“The sponsor could not justify a year of seats for seasonal work.”
Confirmed by buyer · finance review · 01 Jun 2026
OP-2026-0135
NobleTide Media
Media production · client pitch prep · closed 26 Jun 2026
45
Closed Won
Editable presentation
“The editorial team needed to keep changing the deck after generation.”
Confirmed by buyer · creative operations email · 24 Jun 2026
OP-2026-0136
OpalForge Automation
Automation equipment · configuration proposals · closed 16 Jul 2026
70
Closed Lost
Integration cost
“The additional product-system work made the first phase too expensive.”
Buyer statement relayed by seller · loss review · 14 Jul 2026
OP-2026-0137
Pinehaven Property
Property services · tenant briefing · closed 30 Jul 2026
56
Closed Won
Context retention
“The recurring briefing used the latest agreed actions.”
Confirmed by buyer · service owner review · 28 Jul 2026
OP-2026-0139
RiverAsh Maritime
Maritime services · service proposals · closed 27 Aug 2026
39
No Decision
Procurement delay
“The vendor decision will wait until next year's fleet contract renewals.”
Confirmed by buyer · procurement email · 26 Aug 2026
OP-2026-0140
SableWing Software
B2B software · RFP preparation · closed 10 Sep 2026
62
Closed Won
Multi-file editing
“The same change appeared in the response and the meeting material.”
Confirmed by buyer · pilot completion · 08 Sep 2026
Crestline 6.1, not 6.2

Other adjacent-risk records not selected as direct comparables remain visible here; No Decision means purchase stopped or deferred without a named winner. Confirmation labels come from each CRM row and are not upgraded by this report.

Turn the signal into a decision test.

Recommendations are specific to AsterVale’s supplied priorities and the loss patterns; each should produce evidence an evaluator can inspect.

Stage the cross-task proof

Use one authorized engagement source in a proposal task, then a separate client-briefing task. Show the source/version reference, a correction, the same approved context reused, and a missing-fact refusal. Let the evaluator inspect each native file. This directly tests the differentiators reflected in VelaBridge, Rainford, Cloudmarsh and SableWing.

Owner: solution lead · Evidence: saved test outputs

Make the gates explicit before asking for preference

Have IT and Security record a go/no-go view on manual provisioning, offboarding, group behavior, processing route, subprocessors, assurance evidence and the incident-notice clause. The HarborElm / Greenhaven losses show SCIM/access requirements can be decisive; JuniperSpan shows late assurance can close the window (its source was seller-relayed).

Owners: customer IT + security; Noumi response owners

Separate workflow memory from records governance

Ask whether AsterVale primarily needs engagement-specific context or a controlled reference library with named owners, approval, retention and legal holds. Demo client separation and source versioning, but do not claim a project workspace is a records-management system. Give Crestline’s governance case a fair, explicit test.

Owner: business sponsor · Evidence: agreed acceptance rubric

Measure the editable handoff, not first-draft speed

Score DOCX/XLSX/PPTX editability, evidence traceability, factual corrections and reviewer reconstruction time. Include one representative PowerPoint layout, state unsupported animation/object limits, and count failed tasks and rework. Keep capacity value distinct from cash savings.

Owners: workflow leads · Evidence: pre-agreed pilot log

De-risk budget and decision ownership

Normalize scope and total effort behind the stated $3,600 year-one / $6,000 recurring supplier-fee difference; usage units are not comparable. Confirm budget holder, legal approvers, pilot conditions and a dated selection path so a positive demo cannot turn into a sponsorless No Decision.

Owner: account director · Evidence: normalized quote + action register

Keep a credible alternative case

If Notion write-back, centralized lifecycle controls or SCIM are hard requirements, state the gap and quantify any workaround/SOW before bid approval. LindenArc’s 60-seat loss is the closest current warning; do not let the workflow win conceal an integration dependency.

Owner: opportunity team · Evidence: scoped gap disposition
Provisional opportunity stance: compete where the buyer values continuity into editable proposal and meeting deliverables; do not describe this as a likely win until the named technical/security gates, commercial normalization and procurement authority are confirmed. The supplied brief and later meeting record disagree in stage/timing; reconcile with the CRM owner before using this report for external commitments.

Useful precedent, bounded conclusions.

Source records are internal and the source chronology itself needs reconciliation. The report preserves that uncertainty instead of smoothing it away.

Limitations that matter

Read these constraints before using any historical signal.

  • No AsterVale CRM rowIn the 40-record extract, no CRM stage, probability or recorded outcome for AV-2026-041 can be verified.
  • Source-date conflictThis report is dated 30 Sep 2026. The opportunity brief says snapshot 1 Oct; the comparison workbook cites Addendum 01 dated 9 Oct and a Noumi quote issued 14 Oct; a supplied meeting transcript is dated 22 Oct and describes a later conditional pilot. Those later materials are supplied evidence, not verified current state as of this report date. The brief and transcript stages do not reconcile.
  • Small, selected cohortsThe sample contains 9 strict direct analogues and 18 adjacent records. It is purposefully selected using known AsterVale dimensions; it is not random or statistically representative.
  • Qualitative reason codingCRM quotes and reasons are not quantified impact measures. A few are seller-relayed or internal-only; labels are retained. “Closed Lost” does not establish one universal technical cause.
  • Version and market driftThe CRM spans Noumi releases 2025.4–2026.3 and Crestline Workbench 6.0–6.2. The closest direct 6.2 comparison is LindenArc, which was lost; SableWing won against 6.1, explicitly not 6.2.
  • Commercial comparability is limitedCRM cost fields compare Noumi fees only, excluding competitor schedules, taxes, usage overages and customer internal effort. AsterVale fee figures are not normalized scope or TCO.
  • Outcome biasNo-decision outcomes can reflect timing, budget, sponsor or readiness, not relative product merit. They are shown separately and are never recoded as losses.
  • Competitive comparison boundaryClaims reflect the supplied Noumi capability and security documents and the Crestline handbook. “Not described” is not evidence of absent capability. Product materials do not prove AsterVale configuration, contract acceptance or test performance.

Source register

The files and extracts used to support this report.

  • CRM historyCRM_Opportunity_History.csvFull 40 records, including outcome, use case, seats, competitor version, primary reason, quote, source type, confirmation and verification dates. Last CRM close date: 24 Sep 2026. Latest listed verification: 28 Sep 2026.
  • AsterVale opportunity briefAsterVale_Opportunity_Brief.mdSections 1–3, 5–7 and 9–10; version 1.1; snapshot date 1 Oct 2026.
  • Competitive comparisonAsterVale_Product_Comparison_Noumi_vs_Crestline.xlsxDecision view A6:E14; Priority comparison A6:I22; Commercial comparison A6:J16; Sources & notes A6:E13. Stated verification date: 30 Sep 2026.
  • Crestline product evidenceCrestline_Product_Documentation.pdfWorkbench 6.2 Enterprise guide, document C-WB-62-202609 rev 1.0, published 21 Sep 2026; sections 2–7 and 9.
  • Noumi capability evidenceNoumi_Product_Capabilities.mdEnterprise 2026.3 v1.1, 28 Sep 2026; capability records CAP-001/003/006/008–012/016/020–022/028–046.
  • Noumi security evidenceNoumi_Security_and_Data_Handling.mdEnterprise 2026.3 v1.0, 28 Sep 2026; processing, permissions, key, model, resilience and assurance sections.
  • Later-dated AsterVale records providedOfficial QA PDF dated 9 Oct 2026 and supplier meeting transcript dated 22 Oct 2026. These disclose the chronology inconsistency; they do not reconcile the current CRM stage or establish award, security or contract acceptance.

Calculation: overall decided win share = 18 ÷ (18 + 15) = 54.5%; direct = 6 ÷ (6 + 3) = 66.7%; adjacent = 9 ÷ (9 + 2) = 81.8% among decisions only. All derived figures use CRM outcome labels without reclassification.